Monday, November 16, 2026

THIRD 1950s OPERATING SESSION

At the beginning of November, we conducted the third operating session featuring 1950s equipment and Timetable and Train Order (TT&TO) operation control.  The equipment is “settling,” though a lot of work on that front remains.  Similarly, operating practices with TT&TO authority are developing into new regular patterns. 

On the equipment front I am adding forty to fifty freight cars each month.  With this third session, that effort fleshed out the road freights to the desired twenty-five car length while also covering the local freight service.  More are needed in both categories, but efforts over the past couple of months have produced road freights that look the part and local freight activity including yard work that was recognizable for all.  

 

I made a significant commitment to ensure at least basic weathering was applied to all new cars, contrasting to the flurry of new (and then never weathered) freight cars that populated the railroad for the 1984 operations.  While the new cars receive basic inspection and tweaking of couplers and trucks, the same has not always been the case for older cars—moved north from California upon my retirement.  My crews have discovered a number of wheelset, truck, and coupler issues which seem to be concentrated on these cars.  A more rigorous inspection program is warranted!  This is all part of a settling and weeding out process that I vaguely recall from the early operations on the railroad.  With a basic service level now attained by the car fleet, I can shift back to a more measured approach.

 

With three sessions now completed using the timetable, we have worked through the full twenty-four-hour schedule.  The first session prompted a timetable revision based on the actual layout geometry, particularly distances between stations.  The second and third sessions used that revision and it seems to be holding.  Each of the TT&TO operating sessions worked eight fast-hours of the schedule.  One result of that has been a more rigid set of call times for the local freights.  Each session has had one of the three Springfield area locals.  The Oakridge Turn went out to Oakridge in the first session, took a crew rest (no activity) for the second session and saw the return trek to Eugene via service at Westfir in the third session.  This fits with my understanding of remarks from former Southern Pacific operating personnel—regular daily patterns.  

 


Oakridge Turn engineer Jim L. (green shirt, center) studies his paperwork as he serves the Western Lumber mill at Westfir.  In the background, Pete J. helps Helper Engineer Doug C. understand his train orders for his light-loco return from Cascade Summit.  Keith K. (head just above the Salt Creek Trestle) listens to Pete’s instructions as Keith learns his role as “Mountain Operator.”

 

Duties and support for the Train Order operators are developing.  One change introduced was “OS Slips”—a paper OS report crews at selected stations would fill out and deliver to the appropriate Train Order Operator.  This is a practice inspired by the prototype SP practice of train register tickets filled out by First Class train conductors for tossed-off delivery to specified stations without a station stop.  In the case of my railroad, the OS slips provide a manageable communication between crews and TO Operators where the TO Operator does not have an easy view of the station.  The OS slips are in use at the Eugene Arrival-Departure Yard, Crescent Lake and Cascade Summit.  The first two of those stations are the end points of the modeled railroad and are on the other side of the basement stairwell from the TO Operator who covers those layout ends, Eugene Depot, and Springfield.  Train Registers are also located at those two end points.  Cascade Summit is located above and behind the location of the Oakridge Operator who also covers the summit.  

 


Eugene-Springfield Train Order Operator Rick A. (seated) studies paperwork while the Eugene depot and classification yard crew work behind him.

 


Oakridge TO Operator Joe B. (left) talks with the Dispatcher while Helper Engineer Rodger C. and Road Freight Engineer Steve K. study the timetable at Oakridge.

 

One aspect of the timetable has been heavier use of already-busy Oakridge.  With helpers based at Oakridge, they entrain there.  The historic SP timetable featured hour-long station stops at Oakridge for the scheduled RR-Westward (uphill) freights (Second Class trains).  I suspect this hour-long station stop was scheduled to include both the act of placing helpers within a train and the necessary full-train inspection conducted on foot in the 1950s—done at night in the rain.  Three of the four Second Class train schedules also feature a meet with a First Class train during their hour station stop at Oakridge.

 


Meet at Oakridge.  Train No. 19, the RR-West Klamath Mail train is just visible on the Oakridge siding, seen close to the backdrop.  A RR-East freight running Extra improperly occupies the main line.  Two sections of RR-West No. 371 occupy yard tracks 2 and 4, with their helpers entrained.  We talked about proper use of the mainline at Oakridge during the session debrief.

 

An interesting aspect of the night shift (Midnight to 8:00 am) timetable segment we operated was the delivery of the baggage car that shuttled between Portland and Eugene.  By the 1958 period I currently am nominally using for the equipment, that car ran both ways on the Klamath mail train.  During this session it arrived from “Portland.”  I left it up to the Eugene crew to decide how to perform this drop off.  The assigned yard switcher elected to pull most of the train (the car was close to the train head end) to make the switch moves.  We quickly decided that an alternative practice would be far better.  When the train crew removes their power from the train, a switcher at that end of the depot tracks could make the coupler cut, pull that car and the few express cars ahead of it, set out the car on available track—the WP Siding right next to the depot would be ideal, and then help reassemble the train.  Following the departure of the train from Eugene, either that switcher could be used after a run-around move or another switcher at the other end of the depot complex could collect the baggage car to spot it at the freight depot.  We are learning.  That has been one of my objectives in back-dating the railroad—to try to learn how the railroad (likely) operated back in the 1950s.

 


Eugene Switcher Jeff S. spots the Portland to Eugene baggage car at the freight depot.  This was a first attempt.  We will change the procedure next time to reduce the station time for the train and avoid moving occupied cars in the train.

 

I have been pleasantly surprised by the strong positive response from much of my regular operating crew to the shift in operating era.  I expected positive response to the earlier equipment era.  The surprise has been the positive response to Timetable and Train Order operations.  Although a good core of the group has experienced TT&TO on at least one other local layout, there also are a number of crewmembers who must learn the earlier form of train control and learn the discipline they must exercise in deciding when they can leave a siding or station.  The long-term key to this will be training both Dispatchers and Train Order Operators so we have enough people skilled in those positions to run the railroad.