Tuesday, February 7, 2017

TWELTH FULL OPERATING SESSION

Formal operating sessions on my SP Cascade Line finally started off in early February. For many model railroads, twelve sessions would be accomplished in a single year of monthly sessions.  Schedule conflicts, holidays and weather extended the time for me to reach that milestone to almost a year and a half.  Still it is gratifying to have a dozen sessions completed.

Nineteen operators joined me for this session.  As recorded in these pages previously, this session marked the introduction of two important supporting structures.  The new operator platform for Crescent Lake retired the use of step ladders, much to my liability relief.  It helps Crescent Lake operations a great deal.  A crowd of three or four operators easily fit on the platform, allowing a couple of train crews (e.g., in-bound and out-bound) to coordinate and control their activities.


Dick E., serving as Conductor of a RR-East train talks to the Dispatcher as he and his engineer look upon their train at Crescent Lake.  The new platform helps a great deal!

The second construction project of the last couple of months was a new Dispatcher’s Panel (model board) mounted to the desk.  The desk was modified to put it on wheels.  This allowed the Dispatcher’s desk and panel to be wheeled into our exercise room.  That, in turn, provided the noise isolation my Dispatchers have craved.


Mike Y. serves as Dispatcher in a room with a door he can use to shut the noise out.

This operating session used the same train line-up we have used since starting full mainline operations in June, 2015.  A dozen trains travel the full mainline, while five locals serve on-layout industries.  A yard crew of four (yardmaster, Santa Clara Tower Operator, East and West Switchers) keeps the action going by making or breaking up trains as needed. 


Action is heavy in the Eugene Classification Yard across from the depot.  Left to right, West Switcher Rick A. works his end of the yard.  Mike L. with the Eugene City Switcher (one of the locals) works industries in the depot area.  Engineer Brigg F. runs his train through on the mainline.  Yardmaster Dave H. is organizing the yard work while East Switcher Scott B. awaits instructions.  Tom D. passes by, having completed his work with the first Springfield local.


Santa Clara Tower Operator Vic N. hostles road power from the engine facility to a waiting RR-West train.  With additional crew members, a hostler can be assigned to help the tower operator.  Though the job is titled “Tower Operator,” it actually involves controlling operations in the Eugene Arrival/Departure Yard.  The tower function of the job controls the many switches in the yard throat.  Vic has helped define this job, but will soon move on to learning additional jobs on the railroad.  This job became much easier by moving Crescent Lake operations up onto the platform seen behind Vic.


Model Railroad operation involves waiting.  Two crews wait for clearance out of the Eugene Arrival/Departure Yard.  Assistant Chief Dispatcher John B. tries to get traffic rolling by coordinating among crews, train availability and the session Dispatcher (in the room behind the slightly ajar door).  Mike B. and Brigg F. form one crew, while Josef B. serves as another crew.  Both are awaiting clearance out of the yard—a common situation for railroaders.


Out on the line, up in the mountains, Greg P. copies train authority from the Dispatcher, while Rodger C. controls his train down through Cruzatte (RR-Eastbound).  In the distance, helper engineer Norm A. and train crew Dick E. and Dave C. hold in the clear on the Wicopee siding for Rodger’s eastbound. 


Harry B. and Tom D. teamed up to work the first Springfield Turn.  This job switches the industries on the depot side of the mainline.  Harry B. built the model of Tilbury Cement, the green structure close to the backdrop on the right. 


Bill M. works the Oakridge Turn.  This job starts the session in Oakridge, providing activity that does not require Eugene Yard interaction until the Turn returns to Eugene. 


Some of the “activity” is simply waiting.  Helper engineer Norm A. and road engineer Josef B. wait with their train at McCredie Springs.


The wait at McCredie Springs eventually yields a meet with a RR-Eastbound train.  Both will be moving soon.


At times, one could capture multiple trains in action.  Rodger C. is barely visible underneath Cascade Summit bringing a train through McCredie Springs.  Josef B. has made it to Cascade Summit.  In the foreground, Jim M. awaits another RR-Westbound to put his helper set on.  Bill M. continues to work the Oakridge Turn.  He has just delivered cars to the engine facility at Oakridge (oil and supplies).  Norm A. set his throttle for his helpers, so he is just biding time and movement—much like full-sized helper operations! (wink)  Mike B. watches the action up high as a train crawls up-grade out of Cruzatte toward Cascade Summit.


A critical part of my operating sessions is lunch!  We often serve chili while the crew brings potluck.  Nobody goes away hungry!


A mid-session break for lunch allows the crew to relax a bit and converse.  This social aspect of operating sessions is important and should not be overlooked!


Toward the end of the session, traffic got snarled at Springfield.  A mainline RR-West train occupies the main.  The second Springfield job occupies the siding and Booth Kelly tracks.  The Marcola Turn is using the depot and drill tracks.  Unfortunately, there is a RR-East Train just outside of view to the right with no place to go.    This turns out not to be a Dispatcher error, but rather a missed communication by the Springfield local crew who failed to get Dispatcher permission to exit Eugene, use the Judkins block and then occupy the Springfield Siding to do their work.  Count this as an example for a teaching moment for the next operating session.


The railroad performed well and the crew had a good time.  Most were already “marking up” for the next session in four weeks.

Friday, January 20, 2017

MORE FLANGER ACTIVITY

Running the flanger last weekend proved a fortunate choice of activity to dispel the disappointment of needing to cancel the first operating session of the new year.  Not only was it appropriate for the snow and ice conditions outside, but my selection of equipment helped me identify the cause of the occasional derailments my crews have experienced at turnouts on the mountain grade.  Each time the Broadway Limited Imports (BLI) SD9 derailed, I took note.  A pattern of derailment at the turnout frogs emerged. 

Armed with my trusty NMRA gauge, I finally turned it over to use the flangeway tabs on the top of the gauge rather than the track gauge prongs on the bottom of the gauge.  The problem became quite clear.  Although the running rails were in gauge, the back-to-back distance across the guardrails was too wide.  The BLI SD9 had wheels set at the minimum back-to-back distance.  They were in gauge, but right at the minimum.  This combined with the three axle truck configuration to “find” every place flangeway back-to-back distance was wider than needed for the minimum gauge wheelsets. 


NMRA track gauge measuring turnout frog flangeways.

The too-broad flangeway settings was a systemic issue for my construction of FastTracks turnouts.  Checking with local fellow FastTracks users, I found they, too, had found the need for extra care and tuning of this dimension.

The cure was straightforward.  I spent a couple of days with a point file and other needle files (pictured) opening up the flangeways.  My flangeway widths cleared the minimum standard, so my choice was to file the guardrail in the frog assembly to provide the needed clearance.  This ensures the guardrail on the stock rail side will pull the wheels toward the stock rail and away from the frog.  Although the solution was “straight-forward,” my fingers and fingernails suffered through all of this.  I reworked some twenty turnouts over a couple of days.  Ouch!

While I was working on issues highlighted by my flanger operation, I finally tackled a modest project at Cascade Summit by installing the throw rods and knobs for the BluePoint switch machines at the base of the summit wye.  With modern diesel operations, we had not needed to use the wye.  Helper sets had controlling locomotive units facing both directions.  The flanger needed to be turned, though—the reason wyes still exist on the prototype Cascade Line.  This was a simple task that finally rose into my action list.


Flanger set backing onto the base of the summit turning wye.  The black knob is on the switch throw rod for the switch the flanger set is passing through.

Another track maintenance item tackled during this winter down time was eliminating several “sun kinks” that had developed.  Although we jokingly refer to the bowed or warped track as a “sun kink,” the cause is quite the opposite.  Prototype railroads can experience rail expanding with high amounts of sun heating, causing track to bow out of alignment. 

Though our model track might bow in a similar fashion, the cause is not rail expansion.  Quite the contrary, the rail is nearly constant in length.  My basement temperature stays within ten degrees between winter and summer—not much thermal expansion in nickle silver rail with that.  The issue is the shrinkage of the benchwork as the humidity level drops.  Such is the case with low (for this area) outside temperatures.  That low temperature air gets heated up indoors and in the process dries out.  The relative humidity drops and with it, the moisture content of the wood benchwork and roadbed drops. 

I had several track kinks to maintain.  The solution was to cut a little bit off of the rail and then move and secure the rail and track back into place.  In most cases, this simply involved reapplying the caulk I use to secure track.  In one case, the rail had popped out of the plastic spikes holding it to the ties.  There, I had to hand spike the rail back into position. 


Over time, each of these maintenance issues is resolved, leading to more reliable operations.  I look forward to my full crew arriving in early February to test my handiwork.

Sunday, January 8, 2017

CALL THE FLANGER!

This winter is shaping up to be one impacted by snow in the Willamette Valley.  Western Oregon is a mild climate, albeit wet, but every few years produces a winter with several snowfalls.  Such is this year, with two snows locally in December and another one this first weekend of January.  I already can hear the derision from other parts of the country.  Fair enough if one plans for snow as a routine.  Such is not the case in the populous regions of Oregon, although the Columbia River Gorge weather effect is well known to residents of the Portland metro area.  Suffice to say our modest snowfall on top of frozen ground this weekend was enough to cause significant transportation difficulties. 

Anticipating bad road conditions, I had to cancel my regularly scheduled formal operating session set for Saturday, January 7, 2017.  I had twenty folk scheduled to operate coming from as far away as Eugene and Oakridge and Kalama, WA.  I owed to my crew to not force them into what would be a nasty return trip after the session.  The forecast proved correct, with snow beginning here in McMinnville in late morning.  Crewmembers from further south in the Willamette Valley reported “ice rink” conditions early in the morning.  By the time we normally would have completed the session in mid-late afternoon, a couple of inches of snow had fallen here and chain controls were posted for Interstate 5 through much of the Valley.  This was a good weekend to stay home and off the roads.


Snow comes to McMinnville in early January, 2017.

The snow cancellation was unfortunate, as earlier in the week I had a group of four regulars come out to help re-stage the railroad and clean track.  The railroad got a good cleaning as did all of the locomotive wheels.  I was beginning the re-stage process when my snow cancellation wiped out my enthusiasm for that effort.  Sigh.

Today, I responded just as the big railroad would—I called out the flanger!  The flanger in question was the one regularly assigned to Oakridge, SPMW 329.  A fine model of this flanger was imported by Albrae Models a couple of years ago.
I noted my acquisition of this model in a previous blog post:
It was time for me to pull the flanger off the plow track at the end of the Oakridge wye and take it up hill.


Gathering the flanger at Oakridge.

Taking the flanger out for a run up hill proved quite useful.  First, I found the flanger trucks needed adjustment to the spring force.  This is a common issue with brass models.  The spring force as built and delivered often is too stiff.  The solution—properly done by the owner/modeler-- is to clip rings of the spring until it just barely applies pressure to the truck bolster.  This permits the truck to rotate more easily.  I am still working on this for this model, as backing through switches still leads to some derailments.



Flanger train climbing out of Oakridge.

The second positive effect of my run up the hill was to find several track sections needing maintenance.  Some of these would have shown themselves—quite negatively—if the scheduled operation had taken place.  This is a challenge for owners of large layouts—getting a chance to operate one’s own railroad.  Often, I have to trust my operating crews to leave notes where they encounter problems—as they are asked to do.  Still, there is nothing quite like experiencing an issue oneself to draw immediate attention!


Flanger passes AMTRAK Number 14 at McCredioe Springs.  Yes, even AMTRAK can be put in the hole for snow equipment!

The low interior humidity accompanying cold weather had an impact on my benchwork.  At least one spot of rail now needs to be trimmed and spiked.  The contraction of the wood benchwork was more than the minimal rail shrinkage with slightly lower interior temperatures.  Sigh.  The maintenance must continue.


Flanger being turned on the Cascade Summit Wye.  Now would be a great time to finish installation of the switch controls to make the wye fully functional!


I hope the start of February is kinder with schedule issues and weather so I can get my railroad back into routine operation.