Official start of construction on my SP Cascade Line was
August 1, 2012. To mark that
anniversary, I thought a tour of the layout as it exists today would be
appropriate. Follow along with a
train head railroad westbound (toward San Francisco in SP direction).
EUGENE
Track laying at Eugene was reported in the previous post (http://espeecascades.blogspot.com/2013/07/track-laid-in-eugene.html). Bridges and track still need to
be completed over the Willamette River between Eugene and Springfield. Most switch machines are in place (44
so far). Wiring is next.
Eugene Depot and Classification Yard
SPRINGFIELD
Springfield was the first station completed. I learned a great deal as I built
switches, laid track, installed switch machines and wired it for DCC control
and eventual signaling. Most of
this construction involved new techniques for me or employed skills long
dormant. Note the layout
fascia has been installed and hand-throw switch linkages have been installed.
SP Extra 7623-West passes through Springfield. Phreddie, our just-acquired Brittany
rescue dog has accompanied me
through layout construction this past week.
MARCOLA BRANCH
Our SP westbound freight takes the mainline passing by the
Marcola Branch trackage. The grain
elevator was a Campbell kit, built four decades ago while I served in the Army
in Virginia. It has survived
moving around the country and has earned its way onto this railroad. The “PAW” (her nickname for me) sign in
the background was a Father’s Day gift from our daughter.
WESTFIR
Westfir development awaits building construction using the
Walthers sawmill and other structures representing Western Lumber. The railroad bridge over the North Fork
of the Willamette River awaits construction with the gap filled by a temporary
arrangement.
Extra SP7623-West passes parts for the mill complex at
Westfir.
OAKRIDGE
Oakridge was the second major station laid on this
railroad. Switch machines
and track wiring are in, but switch linkages and local controls are yet to be
installed.
Extra SP7623-West enters the RR-East end of Oakridge on the
mainline.
Extra SP7623-West at Oakridge awaits a helper and clearance
to start the climb up the Cascade “Hill.”
PHREDDIE
We just added a rescue Brittany to our family. “Phreddie” quickly selected me as his
principal human and has been a welcome companion during railroad construction.
No comments:
Post a Comment