The track plan for the HO scale SP Cascade Line reflects the
priorities established for it and the space available. The highest priority for the layout was
to represent the climb over the Cascades from Oakridge to Cascade Summit,
supporting manned helper operations.
This immediately presented two design challenges: providing for a long
(by model RR standards) mountain climb and locating the pair of locomotive
turning wyes (at Oakridge and the Summit).
The years of concept definition and notional layout design
efforts paid off when the final basement configuration was identified with the
house plan. The notional design
efforts often featured a fold-back of the mountain grade along one wall. The actual Cascade Line provides
just such a feature as the line makes a large “S” configuration of about five
miles length near the middle of the climb. Fortunately, this track feature also has an important scenic
feature—the Salt Creek Trestle, shown as the inspiration view for this blog as
well as its background. The
turn-back curve with the trestle becomes a major scenic feature of the layout
design. Further, the prototype
track arrangement provides ample justification of “stacked tracks”— two levels
of the mainline simultaneously in view.
Locating the wyes logically fell to the top nook corner and
the next one (central top) over.
Though an early layout design swapped the positions of the two wyes
(Oakridge’s being more central in the plan), the final arrangement provided a
longer mainline climb and a better passageway around the wye tail.
The length of mountain climb (about 245 feet) provided 40
inches of climb at the prototype 1.8% from the base level. The base level for Oakridge and the
rest of the valley cities was established at 48 inches based on operating
experience with a number of layouts, most notably the Cal Central Club layout
where I was a member for over three decades. This base height then established the summit height around 88-89 inches, providing an opportunity
for easy passage underneath the summit trackage. As seen in the
image below, Cascade Summit will be built out over the track coming up out of
Oakridge, forming an operator “tunnel” for the lower level. Even my 6’ 4” frame should not be
challenged by the modest height under Cascade Summit. The Summit scene maintains adequate clearance from the room
ceiling which is at 9’ 6”.
As the layout design process proceeded, it became clear that
Oakridge represented a key operating and scenic feature. The layout plan provides for all tracks
present at Oakridge in 1954.
Compromises were necessary, notably in the relative positions of the
depot and engine facilities, but the result should operate much as the original
during the era of steam helpers.
Flanking Oakridge are the pair of large lumber mills: Pope and Talbot to
the geographic east and Western Lumber at Westfir to the geographic west. Both will be modestly represented, but
they should provide lots of work for the Oakridge Turn.
Fleshing out the remainder of the railroad are Springfield
and Eugene. Springfield is
contained within a large turn-back loop—a compromise made necessary by the
approximately square central layout space. The design for Springfield attempts to capture major
industry located along the mainline.
Also provided is a modest set of tracks representing the Marcola Branch
and interchange with the Weyerhauser operation. The Springfield switcher should be kept very busy!
The design for the layout’s base yard at Eugene provided the
greatest design challenge. The
final design represents many compromises, great simplification, and recognition
of the top priorities for the rest of the layout. Modeling Eugene at any time after the Natron Cutoff (Cascade
Line) was built could consume more space than the entire basement. The current design for Eugene features
the Eugene depot, an Arrival/Departure (A/D) yard that also serves as open
staging, a classification yard (7 tracks plus run-around) sized to serve the modeled
railroad (rest of the layout), “City” industry, and engine facilities. The engine facilities are located
inside the reverse loop staging formed by the A/D yard. They will be accessed via a roll-under
chair—one of the toughest design compromises for the entire layout.
Returning to the top end of the layout, reverse loop staging
will be provided at Crescent Lake.
This loop will be suspended from the ceiling. As described for Cascade Summit, the resulting layout
structure should provide at least seven feet of clearance underneath. Crescent Lake staging will have optical
position detection and probably closed circuit TV to assist operators. A stool, ladder or stand will be
provided so operators can make a direct observation of their train prior to
beginning a descent down the mountain toward Oakridge.
The plan for the HO scale SP Cascade Line should provide for
interesting mainline operation and lots of opportunity for individual car
movement serving industries both large and small.
Great to see things slowly coming together. One thing for sure, you picked the right pass to model! LOL
ReplyDeleteGood times following your posts on this end.
Jeff
SP Org Div