I have expanded the Eugene Arrival/Departure Yard to twelve
tracks per my design. These are
reverse loop tracks. I have been
slowly expanding this last key part of the railroad with first a single loop
track for the “Golden Spike,” then expanding to six and then seven tracks for
full mainline operations. All
twelve tracks are becoming important, though, as I start forcing the issue to
have all trains depart from the “Arrival/Departure” Yard, as designed.
Eugene Arrival/Departure Yard (reverse loop staging) with
most of the planned twelve tracks laid.
The inner loop track (Track 12) has a gap in its middle
right now. I must complete
building a turnout and install it for access off this track into the diesel
fuel and sand facility. That
facility will be along the “right side” of the loop. Laying the switches and tracks for that facility is the
immediate next project. With
switch machines installed and track and machines wired, this will finally move
the arrival and departure operations down into this area.
“Right” side of the Eugene Arrival/Departure Yard. The diesel fuel and sand facility will
go in the open space to the left of the twelve loop tracks.
Nice post, I really enjoy reading your updates. Thanks for sharing this useful information.. keep it up…
ReplyDeletehome health care radnor
Senior Care Bucks County
Senior Care Montgomery County