With track laid at Crescent Lake, I’ve taken a break from
intense new layout construction.
Part of this was to focus on the Thanksgiving holiday and house
guests. Further, it was past time
to address a track repair need and a long-delayed track improvement.
A long-delayed project was the addition of a spur track off
the Oakridge wye to service the future sand house. The test operating sessions used the primary sand track to
provide service, but eventually this track will need to be kept open for
helper locomotives being serviced.
Test fitting a #6 turnout showed I could add such a switch for a sand
spur and still access the wye with at least a 36 inch minimum radius leg.
East Oakridge wye leg with sample #6 switch nearby.
Sample #6 turnout overlaying East Oakridge wye track.
The former East Oakridge wye track was removed using a
technique suggested by Jerry B. for the adhesive caulk. Jerry discovered that an alcohol
soaking softened the adhesive caulk making easy work of track removal and
potential salvage. My previous
effort in the same area used just a putty knife. This is the second time I have revised track in this area. Adding
alcohol to the process made the task easier and made clean-up very much
easier. I was able to scrape the
roadbed to remove the previous caulk.
This contrasted to the sanding operation used before.
Removing the old track with a putty knife after soaking the
area with alcohol.
Track and caulk removed from RR-East leg of the Oakridge
wye. A small pile of scraped-up
caulk is to the left of the putty knife.
The new #6 turnout was installed. Once the caulk set for the turnout, the remainder of the wye
track was formed and fit into place as well as the new spur. Both of these were then permanently
laid with the adhesive caulk.
Revised track at East Oakridge. The new sand spur has its first car delivered.
As I worked on the connecting roadbed and track between
Cascade Summit and Crescent Lake, I ended up destroying a switch at the RR-East
end of the Eugene Depot area immediately below. I simply failed to cover with a hardboard or plywood overlay
all of the track down below. The
result was a bent up switch leading to the depot main track.
Mainline switch at the RR-East end of Eugene Depot requires
replacement.
Replacing the bent switch employed the same process used to
revise the RR-East Oakridge wye to provide the sand spur. An alcohol soak was followed by lifting
the old switch out with a putty knife.
The area was cleaned up and a new switch installed.
New switch installed in the switch ladder at the RR-East end
of the Eugene Depot.
When you're finished installing your switches, come up to Oakridge and fix the prototype turnouts! :) They need some attention.
ReplyDeleteFascinating blog! Is your theme custom made or did you download it from somewhere? A design like yours with a few simple tweeks would really make my blog jump out. Please let me know where you got your theme. Kudos
ReplyDeletedecking handrail systems